The grid challenge
The grid wasn’t designed for what’s coming
EV fast charging and AI data centers are pushing power systems past what they were built to handle.
EV load multiplies fast
One fast-charging station can multiply local demand. Interconnection takes years; sites that could open in months wait instead.
AI compute strains capacity
Demand spikes the grid was never engineered to absorb are rewriting utility capacity plans across every major market.
The charger is not the constraint
The power is already in the building — in transformers, panels and contracts, unused most of the day.